Office, Commercial, Retail Projects

 

KGS Group Winnipeg Office Renovations

Client: KGS Group
Location: Winnipeg, Manitoba
Completion: 2019
Project Details: Parkwest Projects Ltd. was chosen as the Construction Manager for the construction of a renovation and fit up of the existing KGS offices located on Waverly. The project included a phased renovation to ensure minimal disruption of the client’s employees throughout the project. When complete, the entire main floor was fit up as a modern office space and grand main entrance. Staff lounge and collaboration space was also included in the design and construction that Parkwest completed.

 

24/7 InTouch Corporate Offices

Client: 24-7 InTouch Contact Centres
Location: Phase 1 - February 2015
Phase 2 - October 2019
Phase 3 - April 2020
Completion: Winnipeg, Manitoba
Project Details: Parkwest Projects was originally contracted as the Construction Manager for the completion of the initial Corporate Headquarters work for 24-7 InTouch located at 240 Kennedy Ave. This project featured the demolition and stripping of the previous tenants fit-ups to prepare for the upgrades being completed. The space was finished with modern office finishes, featuring collaborative working spaces, staff lounges, creative meeting rooms that fostered open conversation and idea generation, along with a new staff kitchen and lobby area.

After completion of this project, 24-7 InTouch continues its rapid growth, and with that came the requirement for additional space. Based on the results of the first project, Parkwest Projects was contacted again to act as the Construction Manager for phases 2 & 3. When completed 34,000 sq. ft. will be renovated, including the basement, with state-of-the-art office finishes, a fitness centre, bowling alley, and kitchen space.

 

1747 Main Street

Client: 1721 Portage Avenue Office Building
Location: Winnipeg, Manitoba
Completion: 2018
Project Details: Parkwest Projects completed the construction of a brand new, 10,000 sq. ft. 2-storey office space located at 1721 Portage Avenue in Winnipeg, Manitoba. After completion, Parkwest performed the fit up of 5,000 sq. ft. of space for a dental office. The building includes an attractive modern design which was constructed within the strict schedule outlined by the client for promised tenant move-in dates.

 

1721 Portage Avenue Office Building

Location: Winnipeg, Manitoba
Completion: 2018
Project Details: Parkwest Projects completed the construction of a brand new, 10,000 sq. ft. 2-storey office space located at 1721 Portage Avenue in Winnipeg, Manitoba. After completion, Parkwest performed the fit up of 5,000 sq. ft. of space for a dental office. The building includes an attractive modern design which was constructed within the strict schedule outlined by the client for promised tenant move-in dates.

 

1463 Pembina Highway CRU Renovation

Location: Winnipeg, Manitoba
Completion: 2016
Project Details: Through established relationships with the owner based on past project experience, Parkwest was contacted to act as the Construction Manager for the complete renovation of the commercial retail unit located at 1463 Pembina Highway in Winnipeg, Manitoba. The 10,000 sq. ft. space was completed gutted and rebuilt with a new curtain wall, building envelope, windows, and electrical and mechanical systems.

After another successful build, Parkwest was recommended to the future tenants to be used for their fit-up work. We completed the fit up of Stella’s Restaurants, the offices of the COllege of Physiotherapists of Manitoba, and Winnipeg Spine and Sports Therapy.

 

MPI Lexington

Client: Manitoba Public Insurance
Location: 40 Lexington Park, Winnipeg, MB
Completion: 2010
Project Details: Parkwest Projects Ltd. was the General Contractor for one of the five new Customer Service Centres that were constructed in 2009 for Manitoba Public Insurance across the province. This ~$12M, 4,088 square meter building that combined both office space and garage space to merge the claims process, driver and vehicle licensing and driver testing functions into the same building. A target for the project was to construct a facility that environmentally sustainable. This included a targeted LEED Silver building designation as well as the successful award of a Green Globe award.

 

St. Anne’s CRU

Location: Winnipeg, Manitoba
Completion: 2017
Project Details: Parkwest Projects was contacted by a repeat client to assist in the construction of a new, 11,000 sq. ft. commercial retail unit on St. Anne’s Road in Winnipeg, Manitoba. This project included all facets of construction, from foundation work to outside finishes and mechanical and electrical systems. The modern looking building quickly filled with tenants upon completion.

 

St. Anne’s CRU

Location: Henderson Safeway CRU
Client: Safeway Canada
Completion: 2011
Project Details: After having completed the construction of the adjacent Safeway Grocery Store, Parkwest Projects was contracted to complete the attached, client owned commercial retail unit. The nearly 10,000 sq. ft. unit was built for space to allow for 5 tenants.

 

1261 Main Street Office Renovation

Location: Winnipeg, Manitoba
Completion: 2014
Project Details: This project consisted of a complete retrofit and facelift of an existing building. This included a new curtain wall face of the building, new building envelope and replacement of all windows. Work also consisted of an upgrade to the electrical service and mechanical systems, including new roof top units. Phase 2 work consisted of complete tenant improvements for 2 floors of the building, including a redesigned front foyer and staircase.

The owner satisfaction achieved with this project has resulted in Parkwest Projects performing numerous similar projects, including 1463 Pembina Ave and 980 St. Anne’s Road commercial retail units.